
Mina Al Arab
Porto Playa, located on Hayat Island within the Mina Al Arab development, redefines luxury living with its blend of sophisticated architecture and serene waterfront views. This community offers an extensive range of amenities, from jogging and cycling tracks to landscaped gardens and private beachfront access. The development features a variety of homes,each designed to cater to different lifestyles. The location ensures easy access to key destinations, including Al Naeem Mall, RAK Mall, and Ras Al Khaimah International Airport. Porto Playa’s community-centered design includes retail outlets, restaurants, fitness centers, and children’s play areas, ensuring that residents have everything they need for a balanced lifestyle. With its tranquil surroundings and world-class amenities, Porto Playa is the ultimate address for those seeking a refined lifestyle in Ras Al Khaimah.
Construction Started
21/04/2024
Expected Completion
30/12/2026
How your purchase is structured — tap a phase for the full schedule.
| Milestone | Percentage | Amount |
|---|---|---|
| During construction | 30% | AED 450,248 |
| On handover | 50% | AED 750,414 |
| Milestone | Percentage | Amount |
|---|---|---|
| Down payment | 20% | AED 300,166 |
The payment plan for Porto Playa is structured as follows: 20% is required as a down payment at the sales launch, 30% is due during construction, and the remaining 50% is payable upon handover.
The owner of Porto Playa is Ellington. Renowned for its commitment to quality and innovative design, Ellington delivers exceptional developments that redefine modern living and luxury standards.
Porto Playa is set to be delivered in December 2026. This anticipated completion date marks the realization of a thoughtfully designed project in a prime location.
Porto Playa is an excellent investment opportunity, offering a unique blend of luxury, convenience, and prime location on Hayat Island within the Mina Al Arab complex. Residents enjoy beachfront access, landscaped gardens, and recreational facilities, making it ideal for families and individuals alike. Its proximity to major landmarks, including InterContinental Mina Al Arab and Al Naeem Mall, enhances its appeal. With diverse housing options and top-notch community amenities, Porto Playa provides a high-quality lifestyle in a picturesque setting, ensuring strong potential for value appreciation and rental demand.
The starting price for Porto Playa is 1500828 AED.
Price (AED)
From AED 1.5M
Gross Yield
—
Area
From 437–6,323 sqft
Bedrooms
Studio – 4 BR
Bathrooms
1–6
Developer
Ellington
Handover
December 2026
Prices and sizes are indicative starting points where shown.
At a glance
Situated on the picturesque Hayat Island within the prestigious Mina Al Arab complex, Porto Playa by Ellington offers a rare combination of premium waterfront living and serene coastal charm. This exclusive off-plan community features 1, 2, and 3-bedroom apartments alongside spacious villas, designed to blend modern sophistication with tranquil seaside vibes.
Scheduled for completion in Q4 2026, the development creates a boutique residential haven for those who value both style and privacy. The low-density layout ensures a calm and intimate environment, allowing residents to enjoy sweeping sea views, landscaped surroundings, and a sense of exclusivity away from the city’s bustle.
Porto Playa enjoys a strategic position on Hayat Island, within the renowned Mina Al Arab waterfront community. This prime location offers residents the best of both worlds: a peaceful coastal lifestyle while remaining close to Ras Al Khaimah’s key landmarks and essential amenities.
The architectural features of Porto Playa showcase contemporary design that complements its natural coastal setting. Emphasising clean lines, open layouts, and a strong connection between indoor and outdoor spaces, each residence becomes a light-filled sanctuary with panoramic views.
Developer
Ellington
Community
Mina Al Arab
Location
Ras Al Khaimah, Mina Al Arab, Porto Playa
Type
Apartment, Townhouse, Villa
Handover
December 2026
Status
Off plan